The wood floor is basically done. We (or, I should say, Joel) will have to go back and put in some trim pieces and finish up the pantry floor but other than that we finished around 6pm today. Above are the pictures. Obviously I am too tired to clean--notice all the big black trash bags of construction debris and all the toys the girls have drug out. But I will post some more pics tomorrow of our new appliances and a cleaned up kitchen (for those of you tracking it, I haven't had a stove or dishwasher for 2 weeks and I haven't even had a microwave for the past 2 days).
Joel was wondering how many hours he had spent working. So, here is a breakdown of all of our work:Jan. 17-20 we ripped out the floors. Joel worked about 17 hours and we had 2 workers for 7 hours each. I didn't help much on these days--I was too busy keeping the girls away from the splintered wood.
Jan. 25-27 Joel finished cleaning off the subfloor. And we started installing the new bamboo. Joel worked for about 18 hours and I helped about 9 hours.
Feb. 1-3 Joel and I both worked really hard this weekend installing the flooring. Joel worked about 26 hours and I helped about 20 hours.
If you add up all the man hours, that is 104 hours. We had an estimate on getting professionals to do the work. It would have cost about $6500 for labor alone. So basically we saved $65 for every hour put into the floor. Pretty good savings.
Following are some pics of Joel working.
All in all we are very happy that we took on this project. It was a lot of work and our house has been in chaos for 2 1/2 weeks but we really like saving over $6,000. And the floor looks fantastic--it really opens up the kitchen/dining area.